A number of retrofitting (design and supervision) projects implemented by the Structure & Retrofitting Group
No. |
Project Name |
Address |
No. of floors |
Area (m2) |
Project Implementation Year |
Project Specifications |
---|---|---|---|---|---|---|
1 |
Study, design, and seismic retrofitting of Shiraz SC2 Building |
Vali-e Asr St., Ghasrodasht, Shiraz |
4 |
5500 |
2017 |
Building seismic retrofitting and rehabilitation |
2 |
Rehabilitation of Alzahra Student Dormitory in Shiraz University of Medical Sciences |
Mulla Sadra St., Shiraz |
6 |
1200 |
2017 |
Building seismic retrofitting and rehabilitation |
3 |
Rehabilitation of Ghods Student Dormitory in Shiraz University |
Elam Sq., Shiraz |
12 |
10250 |
2016 |
Building seismic retrofitting and rehabilitation |
4 |
Retrofitting of the walls around Jahannama Garden, Shiraz Green Space Municipality |
Hafez St., Shiraz |
---- |
500 m in length |
2016 |
Retrofitting of the side walls |
5 |
Retrofitting study and design of a concrete-skeleton building for the Pardis Flower and Plant Complex Management |
Dokouhak, Shiraz |
---- |
1600 |
2016 |
Building seismic retrofitting and rehabilitation |
6 |
The management of the retrofitting plan for buildings in the Fars Telecommunication Company |
Fars Province |
1 to 4 floors |
20000 m2 in total |
2010 to 2013 |
Building seismic retrofitting and rehabilitation |
7 |
Retrofitting of a number of schools in Shiraz (School Renovation) |
Shiraz |
2 to 4 floors |
10000 m2 in total |
2013 |
Seismic retrofitting and rehabilitation |
8 |
Retrofitting study and design of the buildings in the Faculty of Basic Sciences of International Branch of Shiraz University of Medical Sciences |
Sadra Entrance, Shiraz |
8 |
3000 |
2013 |
Building seismic retrofitting and rehabilitation |
9 |
Retrofitting of the Administrative Affairs Building and the Common Goods Warehouse in Fars National Gas Company |
Rahmat Blvd., Shiraz |
1 |
1000 |
2012 |
Building seismic retrofitting and rehabilitation |
10 |
Retrofitting of Eastern Industrial Shed of Fars National Company Gas Company Building |
Zerehi Blvd., Shiraz |
1 |
1250 |
2012 |
Building seismic retrofitting and rehabilitation |
12 |
Retrofitting of Educational Affairs Buildings of Shiraz Malek Ashtar University of Technology
Retrofitting of a residential building (owned by Mr. Abu Ali Yasuj |
Yasuj Electronic Industries Complex, Shiraz |
3 floors
6 floors |
2350
1800 |
2010
2010 |
The steel-structure building has been designed according to the old regulations and needs rehabilitation. The building has been constructed with concrete structure that needs to be retrofitted due to the failure to implement the shear walls and inappropriate sections of the columns. |
12 |
The retrofitting of a a 345-unit complex for employees of Darab Cement Factory |
Darab |
5 floors |
4000 |
2010 |
Due to improper implementation of beams and non-leveling of columns, it needs to be reinforced. |
13 |
Retrofitting of the Building of Mohammad Rasool Allah Clinic in Shiraz |
Pasdaran Blvd., Shiraz |
2 floors |
500 |
2009 |
To construct the second floor, the building should have been retrofitted. |
14 |
Retrofitting of a residential building owned by Mr. Moghimi (Ms. Shirai) |
Goldasht Hafez, Shiraz |
5 floors |
800 |
2009 |
The building was estimated to be constructed in 4 floor but it was built with an additional floor and thus it needed retrofitting. |
15 |
Retrofitting of a residential building owned by Mr. Raeisee |
Rahmat Blvd., Shiraz |
4 floors |
1250 |
2009 |
The building has been constructed with a concrete structure that needed to be retrofitted due to cracks in the beams and lack of proper implementation. |
16 |
Retrofitting of a residential building owned by Mr. Hassani in Yasuj |
Yasuj |
7 floors |
2200 |
2009 |
The building as been constructed with a steel structure with a rigid frame that due to lack of proper implementation of connections need to be retrofitted. |
17 |
Retrofitting of 10-floor apartments for the Army Ground Force (NZAJA) |
Modares Blvd., Shiraz |
10 floors |
9000 |
2008 |
Building seismic retrofitting and rehabilitation |
18 |
Retrofitting of a commercial-office complex in Genaveh owned by Mr. Jamalzadeh |
Genaveh |
4 floors |
6000 |
2008 |
The building has been constructed with a concrete structure that needed to be retrofitted due to inappropriate execution and non-compliance with the executive plans. |
19 |
Retrofitting of Sadra Star Market (Mr. Rahnama) |
Sadra Town, Shiraz |
3 floors |
3000 |
2008 |
The building has been constructed with a structural structure that needs to be retrofitted due to non-compliance with the contents of the 2800 regulations. |
20 |
Retrofitting of firefighting buildings of Shiraz Municipality |
in Shiraz |
2 floors |
with different areas |
2007-2008 |
Building seismic retrofitting and rehabilitation |
21 |
Retrofitting of over 20 two-eight floor buildings |
in Shiraz |
2 to 8 floors |
with different areas |
2007-2013 |
Most of the building have been designed to resist earthquake, but they needed to be retrofitted due to executive problems and incorrect implementation of structures, or changes to the maps or the addition of new floors. |
22 |
Retrofitting of several 2-4 floor buildings in Shiraz owned by Mr. Firouzi, Mr. Shojaat, etc. |
in Shiraz |
2 to 4 floors |
with different areas |
2007-2001 |
Most of the buildings have been designed to resist earthquake, but they needed to be retrofitted due to executive problems and incorrect implementation of structures, or changes to the maps. |
23 |
Retrofitting of the building of Hafez Private University |
Nex to Sepah Bank, Golestan Blvd., Shiraz |
6 floors |
with two 2000-m blocks |
2006 |
The old building has a metal structure without an earthquake resistant system and was retrofitted for gravity and lateral loads in accordance with 23rd edition of the 2800 regulations. |
24 |
Retrofitting of the production building of Razi Vaccine and Serum Institute |
Sanaye Sq., Shiraz |
3 floors |
2000 |
2006 |
The building was constructed as a two-storey concrete structure, based on the second edition of the earthquake regulations, required retrofitting due to the addition of a floor for the air-conditioner units. |
25 |
Retrofitting of the residential complex of Post Cooperative (Dr. Daneshpazhuh) |
Plot #537, Phase 1, Sadra New Town |
4 floors |
Each block is 1400 m2 |
2005
|
The complex design and its metal structre were according to the first edition of the 2800 regulations, and it was retrofitted on the basis of the third edition. Metal structure |
26 |
Retrofitting of Khaleej and Narges Residential Complex of I.R.I Corps Naval Housing Cooperative (NEDSA) |
The 60-hectare area in Sadra New Town |
5 floors |
Six 3600-m apartment blocks |
2005 |
The metal structure had been designed in accordance with the 2nd edition of the 2800 regulations and skeleton and some of its ceilings were constructed, and later on retrofitted based on the third edition. |
27 |
Retrofitting of the Baharestan Residential Complex owned by Shiraz Construction Company and NEDSA Housing Cooperative |
Seraj S., Pasargad Sq., Shiraz |
5 floors |
Thirty 1500-m blocks |
2005-2005 |
The building was designed and executed with a metal structure based on the first edition of the 2800 regulations, and the maps of some of the blocks were revised the structure of the building was retrofitted. |
28 |
Retrofitting of the office building of Shiraz Marine Research Institute |
Marine Research Institute, Chamran Blvd., Shiraz |
2 floors |
1500 |
2001
|
The building was previously computed as a two-storey metal structure based on the first edition of the earthquake regulations, and the first floor was constructed, the second floor was calculated based on the 2nd edition and the first floor was retrofitted. |
29 |
Retrofitting of the gues-thouse and office building of the I.R.I Corps Naval Housing Cooperative (NEDSA) |
Salman Farsi (Pirnia) Blvd., Shiraz |
5 floors |
3000 |
2001 |
The building was pld with a metal structure without an earthquake resistant system, which was retrofitted for gravity and lateral loads according to the earthquake regulations. |